Power cuts on an on-grid system: a battery add-on that fixes them
2026
2,500+ installations since 2009. Sized to your bill, with the ₹78,000 subsidy filed for you.We size the system to your bill, file the PM Surya Ghar subsidy of up to ₹78,000 for you, and service it for the long run.
Indicative, at KSEB domestic tariffs and typical Alappuzha generation. About 6 panels, payback around 3.5 years. Your exact numbers come from the free roof survey.
2,500+
MNRE projects across Kerala
17 yrs
Engineering solar since 2009
4.9★
From 440+ Google reviews
24 hr
Service response commitment

Akhil Alex Xavier
Founder & CEO, SEDNA Energy Systems
Kerala deserved solar done by electrical engineers, not by salesmen with a catalogue.
Akhil founded SEDNA in Cherthala in 2009 after years in electrical systems engineering. Seventeen years and 2,500+ installations later, he still reviews the design of every system that carries the SEDNA name.

Every roof in these photographs is a SEDNA installation, filmed by our own team after handover. Yours could be next.
Start with the power system that fits your supply. Water heaters, inverters, street lights, CCTV and home automation come from the same team.
How often does your area lose power?
Choose one and we will point you to the right system.
Best for homes and businesses with a steady KSEB supplyOn-Grid Solar
Best for sites without a reliable KSEB supplyOff-Grid Solar
Water heaters, backup, cameras, gates and service: supplied, installed and looked after by the same SEDNA team.
Solar Water HeaterHot water heated by the sun, so the electric geyser can stay off. For homes, hostels and hotels.
Inverter & BatteryHome inverters and batteries that carry the house through power cuts, sized to the load you actually run.
Solar Street LightSelf-powered street and compound lights. No external wiring and very little to maintain.
CCTVCamera systems for homes, shops and offices, installed and serviced by SEDNA.
Home AutomationSmart switches and controls for lights, fans and appliances, set up by SEDNA.
Gate AutomationAutomatic swing and sliding gates, opened from a remote, a switch inside the house or your phone.
Old System UpgradesOld off-grid systems, including ANERT and TATA installations, and home inverters, upgraded or converted to on-grid.
Solar AMC & CleaningPanel cleaning and a full health check of any solar system: generation, protection devices, cables, earthing and structure.Panels, inverters and batteries we install, all MNRE-approved























₹78,000PM Surya Ghar subsidy, still credited to youSolar on EMI
Install now and pay through your bank in monthly instalments, over 3 to 10 years. We prepare the quotation the bank needs and file the subsidy alongside the loan.
Our customers take solar loans from


Completed installations, subsidy credits and customer reviews, as they happen, on Instagram, Facebook and YouTube. Real customers, real dates.
CLIENT TESTIMONIAL SOLAR INSTALLATION | PADMAJA |#SEDNAENERGYSYSTEMS #reduceelectricitybills #SEDNA
Open on YouTube9 of 2,500+ installations, each with the site, the panels, the inverter and the expected generation written down. Ask us for the reference on any of them.
Verbatim from customers on Google and Facebook, and on camera in their own homes. Names and places are real; ask us and we will connect you.
“The consultation was informative, the installation was completed on time, and the entire process was smooth and professional. Within just one month, our electricity bill has reduced by an impressive 99%.”
“They did beautiful installation on my Roof at my Villa. They know how to meet customer requirement. Though kseb took 2 months for approvals, they keep me updated weekly status. Very much happy with Sedna installation.”
On camera
“Every two months our consumption came to nearly ₹8,000. I found SEDNA on social media and contacted Akhil, who explained everything. We installed a 3 kilowatt system in 2020, and I can see the production on my phone.”
“Before solar our bill was between ₹2,000 and ₹3,000. Now it comes between ₹125 and ₹150, and we received the ₹78,000 subsidy. They worked well, without damaging anything, and finished quickly.”
“Before installing, my electricity charge was between ₹7,000 and ₹8,000. Now there is no charge apart from the meter rent. I installed without the subsidy, but in the first two years I got back more than the subsidy would have given me.”
At handover






Join them
Three quick steps and a SEDNA engineer calls you back within 24 hours to fix a survey time. No obligation.
Four stages, the same every time. The roof work is the short part; the approvals set the calendar, and we chase every one of them.
Step 1 · 1 hour, on site
We measure the usable roof, run a shadow study through the day, check the structure and read your load. You get an honest size and a quotation that names every component.
Drone survey view of a traditional Kerala home with a SEDNA rooftop arrayStep 2 · Within days
A complete design sized to your bill, not to a subsidy slab. ALMM-listed modules and an established inverter, with the exact models written into the quote.
Top-down drone view of a SEDNA array, laid out to the roof's shade-free areaStep 3 · Typically 2 to 6 weeks
The PM Surya Ghar application and KSEB feasibility go in with you, in your own login. Nothing is installed before approval, because installing early can cost you the subsidy.

PM Surya Ghar · filed by us
₹78,000
Paid straight into the customer's bank account after KSEB commissions the system. Never through us.
Step 4 · 2 to 3 days on the roof
Structure, modules, inverter, earthing and surge protection. Then the KSEB inspection, the net meter, and the certificate upload that releases your subsidy. After that, no customer waits more than 24 hours for service.
Drone view of a finished SEDNA installation on a metal sheet roofStep 1 · 1 hour, on site
We measure the usable roof, run a shadow study through the day, check the structure and read your load. You get an honest size and a quotation that names every component.
Step 2 · Within days
A complete design sized to your bill, not to a subsidy slab. ALMM-listed modules and an established inverter, with the exact models written into the quote.
Step 3 · Typically 2 to 6 weeks
The PM Surya Ghar application and KSEB feasibility go in with you, in your own login. Nothing is installed before approval, because installing early can cost you the subsidy.
Step 4 · 2 to 3 days on the roof
Structure, modules, inverter, earthing and surge protection. Then the KSEB inspection, the net meter, and the certificate upload that releases your subsidy. After that, no customer waits more than 24 hours for service.
Drone survey view of a traditional Kerala home with a SEDNA rooftop arrayThe same care, 2,500 times: engineers on every survey, MNRE-approved components only, and a service desk that has answered since 2009.


The units your roof will really generate, measured at the survey rather than promised on the phone. If a smaller system is right, we quote the smaller system.
Estimate your system
Coastal wind, salt air and three months of rain. Mounting structures and sealed connections chosen from seventeen years of installing in exactly this climate.
Generation through the monsoon
Any service call, any year of ownership: a SEDNA technician responds within 24 hours, and every visit works through a written checklist.
Watch a three-year service visit
PM Surya Ghar paperwork goes in with your application, in your own login. Up to ₹78,000 comes straight to your account, never through us.
Customers who received itEngineers, technicians and the office team who survey, install and service every SEDNA system. The day-to-day, the site trips and the celebrations are on our team Instagram.



Written and filmed by our engineers: subsidy, sizing, net metering, the tricks to avoid. Read or watch before you talk to anyone, including us.
Malayalam explainers
2026
2026
2026
2026
When KSEB or KSERC changes how rooftop solar is approved and connected, we post the circular here with a short summary.
Straight answers about cost, savings, installation, subsidy and what happens after you switch to solar.
Yes. For systems of 3 kW and above under PM Surya Ghar, and we file the paperwork with your application. We don't take it on your behalf; it comes directly to your bank account, typically 30 to 90 days after commissioning.
A correctly sized system removes most of your bill. A home paying ₹3,000 a month typically drops to a few hundred rupees, sometimes near zero. The exact figure depends on your consumption pattern and roof, which is what the free survey calculates. Use the calculator on this page for a first estimate.
As a rule of thumb, divide your monthly bill by ₹1,000 to get a starting kW figure: a ₹3,000 bill points to about 3 kW. The honest answer comes from your units consumed and your roof, measured at survey. Beware of anyone who quotes a size over the phone without seeing either.
A standard on-grid system switches off during outages for the safety of KSEB linemen working on the grid. That is a national safety standard, not a defect. If outages matter in your area, a hybrid system keeps essential circuits running from a battery. We recommend based on how often your locality actually loses power.
Output drops on heavy rain days but never to zero, and the annual average we quote, roughly 4 units per kW per day, already includes the monsoon. Net metering banks your sunny-month surplus with KSEB as credit, which you draw back in the wet months. The billing year evens out what the weather refuses to.
The physical installation of a home system takes 2 to 3 days. End to end, from survey to net-metered commissioning, typically runs four to eight weeks, mostly consumed by KSEB approvals and meter availability rather than construction. We chase every stage so you don't have to.
More questions?
Forty answers on sizing, roofs, monsoon, KSEB, subsidy, batteries and what happens after installation.
One hour on your roof, measured with instruments rather than guessed over the phone, and you have the real numbers for your own house.
Mon to Sat, 9:00 to 18:00. Service line answers 24×7.
Or visit us in Muttom, CherthalaCMC 30, Neyyarapally Arcade