Systems · Hybrid Solar Systems

Export to KSEB by day. Keep the lights on through power cuts.

A hybrid system exports to the grid like on-grid, but keeps a battery for essential loads during outages. You choose which circuits stay alive: lights, fans, the fridge, the Wi-Fi router. When the grid fails, the hybrid inverter switches them to the battery on its own.

  • 4.9 on Google
  • 2,500+ installations
  • MNRE-approved
  • Since 2009
Hybrid solar systems, a real SEDNA installation
Installed by SEDNA · real project record

Advantages

  • Exports surplus power to KSEB under net metering, like on-grid
  • Battery backup for essential loads during power cuts
  • Automatic changeover when the grid fails
  • Battery sized for the loads that matter, usually 2 to 5 kWh for a Kerala home

Honest trade-offs

  • Costs more than on-grid: a battery plus a hybrid inverter premium
  • Batteries need replacing during the life of the system

Not sure which?

We recommend based on how often your locality actually loses power.

Customers on Camera

Hybrid solar systems customers, in their own words.

All customer stories
  • “Our first plant was on-grid, and when KSEB's power went we could not use it. That is why we decided on hybrid. It has been three years, and it averages above 20 units a day.”
    BinoyErnakulam · 5 kWp · HybridTranslated from Malayalam · 2026
On Film

Hybrid systems, installed and explained.

Hybrid installations across Kerala, and short Malayalam explainers on KSEB's rules, TOD billing and power cuts.

All SEDNA videos
  • Power cuts on an on-grid system: a battery add-on that fixes them

    On-grid inverters switch off within 200 milliseconds when KSEB fails. A hybrid MPPT charger added to a 3 kW system now runs the house from a battery during cuts.

    2026

  • A hybrid system's service visit, three years on

    At Ramanattukara, Kozhikode: DB parameters, battery health, yearly generation data, surge protectors, cables and the earth value checked; corrosion treated, a growing tree's shade reported, batteries cleaned and every point re-tightened.

    2025

  • UTL hybrid solar

    2025

  • UTL hybrid system without a battery

    2025

  • Hybrid solar and KSEB's new rules

    A hybrid system powers the house first, charges the battery, exports the surplus and keeps the subsidy, running with or without KSEB supply.

    2025

  • Hybrid solar and TOD billing

    2025

Next Step · Free Roof Assessment

Ready to see what your roof could save?

One hour on your roof, measured with instruments rather than guessed over the phone, and you have the real numbers for your own house.

  • 4.9 on Google
  • 2,500+ installations
  • MNRE-approved
  • Since 2009

Free roof inspection · no obligation

Start with your bill.

1 / 3
  1. Your bill
  2. Your system
  3. Your details
  • Free inspection
  • No obligation
  • Reply within 24 hours
CallWhatsAppGet quote