KSEB · Form · Template

Solar wheeling request letter to KSEB (template)

A ready letter to your KSEB Assistant Engineer asking to wheel surplus solar units from your home to another premise you own. Fill in your section office, name, phone and system size, then attach the KSEB bills of both premises and an address proof.

Key points

  • Addressed to the Assistant Engineer of your KSEB section office.
  • For a grid-connected rooftop system that already has a net-metering agreement with KSEB.
  • Attach the KSEB bills of both premises and an address proof.
  • Wheeling to another premise of your own is provided for in the KSERC 2020 regulations.

Stuck at the section office?

We file the feasibility, registration and net-meter paperwork for every SEDNA installation.

Ask on WhatsApp

Summary by SEDNA Energy Systems. The PDF is the authority; if anything here differs from it, the document wins.

Next Step · Free Roof Assessment

Ready to see what your roof could save?

One hour on your roof, measured with instruments rather than guessed over the phone, and you have the real numbers for your own house.

  • 4.9 on Google
  • 2,500+ installations
  • MNRE-approved
  • Since 2009

Free roof inspection · no obligation

Start with your bill.

1 / 3
  1. Your bill
  2. Your system
  3. Your details
  • Free inspection
  • No obligation
  • Reply within 24 hours
CallWhatsAppGet quote